Your home, your lifestyle.
Lomas del Higuerón is a very ambitious residential project, conceived to meet the expectations of all the owners, where every last detail has been taken care of to make you fall in love with your home every day.
A set of great ideas and a lot of work that makes it the perfect place, integrating the communal areas and vegetation where the outdoor areas flow seamlessly between the homes. Where each phase will be a closed enclosure with security to offer you privacy and intimacy.
Situated in a strategic enclave, Las Lomas del Higuerón is located in the heart of the Costa del Sol. A booming area of recognised high value, where exclusivity and Mediterranean lifestyle blend masterfully, creating a unique living concept.

Lomas 5B:
Blocks 4-5
-Sewer connections.
-Painting.
-Urbanization works.
Blocks 6-7
-Sewer connections.
-Painting.
-Urbanization works.
Blocks 8-9
-Sewer connections.
-Painting.
-Urbanization works.
-Installations.
Blocks 10-11
-Sewer connections.
-Bricklaying and partition walls.
-Urbanization works.
-Installations.

LOMAS 5B:
– Blocks 4 – 5
– Repainting of homes.
– Kitchen installation.
– Blocks 6 – 7
– Ceiling installation.
– Painting.
– Kitchens.
– Blocks 8 – 9
– Flooring installation.
– Painting.
– Blocks 10 – 11
– Drywall partitioning.
– Masonry.
– Installations.

On the 8th of May, ILUSIONARTE presented two residential projects in El Higuerón, between Fuengirola and Benalmádena, at Lomas 4. The event brought together clients and professionals from the sector, generating synergies and future collaborations. The modern and functional designs reflect the firm’s commitment to quality, aesthetics and wellbeing.

LOMAS 5:
Lomas 5A
– Landscape planting.
– Pre-sale reviews.
– Water contracting.
Lomas 5B
– House painting in blocks 4 and 5.
– Kitchen assemblies in block 4 & 5.
– Interior partition walls in blocks 6-7 8-9.
– Installations in all blocks.
– Ceilings in blocks 6-7,8-9,10-11.
– Masonry blocks 10 – 11.
– Installation of roofs in blocks 10 and 11.
– Beginning of swimming pool works.
– Starting of works of urbanization connections.

LOMAS 5:
Lomas 5A
– Finishing construction Works and CFO process.
Lomas 5B
– Finishing the ceilings of the apartments and painting in B4 and B5.
– Installations of kitchen furniture.
– Bricklaying and partitioning in B6, B7, B8 and B9.
– Finishing roofs in B10 and B11.

LOMAS 5:
Lomas 5A
– Construction of exterior retaining walls.
– Sanitation connections installed.
– Start of plumbing connection adaptation.
– Kitchen assembly.
– Painting of Blocks 1 and 2.
– Construction of attics.
– Completion of exterior flooring.
– Completion of site adaptation for signing CFO.
Lomas 5B
– Execution of partitioning and painting in Blocks 4 and 5.
– Masonry and partitioning in Blocks 8 and 9.
– Execution of roofs Blocks 8, 9, 10 and 11.
– Installations in B 6-7-8-9.
– Masonry blocks 10 and 11.
– Plastering in Blocks 4 and 5.

LOMAS 5:
Lomas 5A
– Execution of penthouses.
– Execution of electricity and drainage connections.
– Installation of kitchens.
– Execution of partition walls in Blocks 1 and 2.
– Finishing of roofs in Blocks 1 and 2.
Lomas 5B
– Execution of partition walls in Blocks 4 and 5.
– Masonry in Blocks 8 and 9.
– Execution of roofing Blocks 4, 5, 8 and 9.
– Structure of Blocks 6, 7, 8 10 and 11.

LOMAS 4:
– Finishing of the development and last finishing touches to the common areas.
– Beginning of housing deeds.

LOMAS 2:
– Finishing of the development and last finishing touches to the common areas.
– Beginning of housing deeds.

LOMAS 5:
Lomas 5A
– Interior installations of apartments.
– Aluminum carpentry.
– Floors in common areas.
– Partition walls in blocks 1 and 2.
– Partition walls in attics.
Lomas 5B
– Structures in blocks 6-7, 8-9, 10-11.
– Masonry block 6-7.
– Partition walls block 4-5.
– Installations block 4-5.

LOMAS 4:
– Completion of common areas.
– Review of the condition of the dwellings.

LOMAS 2:
– Completion of residential development works.
– Completion of blocks 4 and 6.
– Completion of telecommunications installations.
– Start-up of elevators.
– Preparation of dwellings for courtesy visits.

LOMAS 5:
Lomas 5A
– Dwellins’ Instalations (water, electricity, air conditioning, sanitation, ventilation, telecommunications).
– Interior partitioning.
– Exterior carpentry.
– Swimming pool.
– Urbanization’s perimetral wall.
Lomas 5B
– Roof structure finnishing. (Buildings 4-5)
– Starting of Sanitation Works, Air conditioning and ventilation. (Buildings 4-5)
– Masonry. (Buildings 4-5)
– Making the strutures. (Rest of the Buildings)

LOMAS 4:
– Last touches to common zones.
– Finishing all instalations.

LOMAS 2:
– Finishing paths on interior common zones.
– Last touches to the dwellings.
– Exterior fences.
– Interior infrastructures.

LOMAS 5:
Lomas 5A
– Structure of the buildings.
– Inside masonnry of the dwellings.
– Storage rooms in the garages.
– Downpipes drains.
– Plasterboard partitioning.
– Interior installations.
– Roofs.
Lomas 5B
– Completion of earthworks.
– Micropiles buildings 10 and 11.
– Foundations and structures buildings 6 – 7 – 8 and 9.
– Inside masonery buildings 4 and 5.

LOMAS 4:
– Flooring of common areas.
– Finishing of dwellings.
– Work on installations in dwellings and communal areas.
– Conditioning of the community’s perimeter.

LOMAS 2:
– Interior partitioning.
– Electricity inside the buildings.
– Flooring and Tiling.
– Roofing.
– Buildings’ external drains and sanitation.
– Electricity jonctions.
– Exterion walls.
– Kitchens.
– Painting and plastering of walls and ceilings.
– Commun zones.

LOMAS 5:
Lomas 5A
– Structure of the buildings.
– Plumbing.
– Electric installations.
– Masonry on dwellings.
– Storage rooms.
– Sanitary sewer downspouts.
– Deck.
Lomas 5B
– Completion of earthworks.
– Micropyle foundations.
– Structure of buildings 4 & 5.
– Cementation and structure of buildings 6 & 7.

LOMAS 4:
– Completion of finishes of the dwellings.
– Installation of kitchens.
– Perimeter walls of the urbanization.
– Perimetral sidewalk of the urbanization.
– Terraces, gardens, and common areas.

LOMAS 3:
– Completion of dwellings finishes.
– Installation of kitchens.
– Perimetral sidewalk of the urbanization.
– Terraces, gardens and common areas.

LOMAS 2:
– Interior partitioning.
– Exterior drainage.
– Electricity inside the buildings.
– Flooring.
– Painting and plastering of ceilings and walls.
– Interior and exterior servicing and landscaping.
– Roofing.

LOMAS 5:
Lomas 5A:
– Structure of the buildings.
– Masonry on dwellings.
– Storage rooms.
– Sanitary sewer downspouts.
Lomas 5B:
– Completion of earthworks.
– Micropyle foundations.
– Cementation and structure of buildings B4 & B5.

LOMAS 4:
– Wooden carpentry.
– Completion of finishes of the dwellings.
– Installation of kitchens.
– Perimeter walls of the urbanization.
– Terraces, gardens and common areas.

LOMAS 3:
– Completion of dwellings finishes.
– Installation of kitchens.
– Perimeter walls of the complex.
– Terraces, gardens and common areas.

LOMAS 2:
– Interior partitioning.
– Exterior drainage.
– Electricity inside the buildings.
– Flooring.
– Painting and plastering of ceilings and walls.
– Interior and exterior servicing and landscaping.
– Roofing.

LOMAS 5:
Lomas 5A:
– Structure of the buildings.
Lomas 5B:
– Completion of earthworks.
– Foundations.

LOMAS 4:
– Wooden carpentry.
– Completion of finishes of the dwellings.
– Installation of kitchens.
– Perimeter walls of the urbanization.
– Terraces, gardens and common areas.

LOMAS 3:
– Completion of dwellings finishes.
– Installation of kitchens.
– Perimeter walls of the complex.
– Terraces, gardens and common areas.

LOMAS 2:
– Interior partitioning.
– Electricity inside the buildings.
– Flooring.
– Roofing.

LOMAS 5:
– Start of foundations.
– Start of structures.

LOMAS 4:
– Starting of façades.
– Installation of interiors.
– Interior urban development works.
– Start of interior carpentries.

LOMAS 3:
– Finishing façades.
– Sanitary installations.
– Interior urban development works.
– Start of interior carpentries.

LOMAS 2:
– Installation of interiors.
– Interior urban development works.
– Start of interior carpentries.
– Executing general installations.

LOMAS 5:
– Earthworks.
– Start of the building’s foundations.

LOMAS 4:
– Finishing plasterboard.
– Installation of sanitary ware.
– Execution of painting.
– Implementation of indoor common areas.

LOMAS 3:
– Finishing plasterboard.
– Installation of sanitary ware.
– Executing of walls painting.
– Implementation of indoor common areas.

LOMAS 2:
– Completion of the structure in all the buildings of the development.
– Executing façades in all the blocks.
– Executing roofs in all blocks.
– Executing interior partition walls in all the blocks.
– Executing exterior installations.

LOMAS 4:
– Completed enclosure.
– Starting with exterior cladding.
– Laying flooring on upper terraces.

LOMAS 3:
– Exterior cladding.
– Laying flooring on upper terraces.

LOMAS 2:
– Executing structure in all blocks of the development.
– Completion of the structure in blocks 1, 2, 3 and 5.
– Carrying out casement enclosure in blocks 1, 2, 3 and 5.
– Installing the metallic structure for the roof of blocks 1, 2, 3 and 5.
– Building the structure in blocks 4, 6, 7 and 8.

LOMAS 3:
– Interior partitioning.
– Interior installations.
– Beginning of interior carpentry.
– Start of false ceilings.
LOMAS 4:
– Concrete structure.
– Facades.

LOMAS 2:
– Making concrete structure.
– Façades.
– Beginning of exterior installations.
– Continuing with housing block structures.

LOMAS 3:
– Completion of façade masonry.
– Waterproofing of roofs.
LOMAS 4:
– Executing structure.
– Carrying out waterproofing of basement walls.

LOMAS 3:
-End of housing block structure.
-Basement partitions.
-Beginning of façades.
LOMAS 4:
-Continuing with the structure of blocks of flats from 1st to 2nd floor.

LOMAS 3:
-Execution of structure on first and first floors.
Formwork of pillars on the first floor.
LOMAS 4:
-Execution of slabs and pillars from basement to ground floor.

LOMAS 3:
-Basement floor structure completed.
-Executing the ground floor slab of the ground floor.
-Concreting the ground floor pillars on the three levels of the structure.
LOMAS 4:
-Performing the pouring of the ground.
-Applying the cleaning concrete.
You are just one step away from your new home. Find all the information you are looking for through the development website, by calling our sales team or visiting the sales office.